Lawrinson Hall Fire Safety Report

Lawrinson Hall

  • Address: 303 Stadium Place
  • Building size: 21 floors plus basement and subbasement, 5 exits
  • Building capacity: 552

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 53
  • Photo-Electric Smoke Detectors: 118
  • Heat Detectors: 71
  • Duct Detectors: 3
  • Alarm: Horns w/Visual: 232
  • Fire Extinguishers: 48
  • Ansul Systems: 0
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 35
  • Water Flow Switches: 32
  • Roof Hatches: 3
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 6, 2019, March 22, 2019, Sept. 17, 2019, and Oct. 16, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019