Brockway Hall Fire Safety Report

Brockway Hall

  • Address: 401 Van Buren Street
  • Building size: 3 floors, 6 exits
  • Building capacity: 27

Fire Protection Systems

  • Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
  • Fire Pump: 1,000 GPM Electric Flow Meter
  • Addressable Pull Stations: 38
  • Photo-Electric Smoke Detectors: 163
  • Heat Detectors: 24
  • Duct Detectors: 3
  • Alarm: Horns w/Visual: 66
  • Fire Extinguishers: 13
  • Ansul Systems: 5
  • Fire Alarm Control Panel: EST-3
  • Sprinkler Supervisory: 27
  • Water Flow Switches: 20
  • Roof Hatches: 0
  • Fire Shutters/Louvers: 0
  • Beam Detectors: 0
  • Alarm System Type: Campus Tie
  • Inspections Requirements: NFPA 72 (1 thru 7)

Inspection, Testing and Maintenance

  • Evacuation drill dates: Feb. 12, 2019, March 19, 2019, Sept. 17, 2019, and Oct. 17, 2019
  • Smoke detection certification: May 14, 2019
  • NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019