Sprinkler System: Wet system throughout building including 100% of student rooms; 2 pre-action dry systems cover the electrical vault and the elevator mechanical room
Fire Pump: 1,000 GPM Electric Flow Meter
Addressable Pull Stations: 27
Photo-Electric Smoke Detectors: 158
Heat Detectors: 18
Duct Detectors: 0
Alarm: Horns w/Visual: 70
Fire Extinguishers: 33
Ansul Systems: 0
Fire Alarm Control Panel: EST-3
Sprinkler Supervisory: 22
Water Flow Switches: 18
Roof Hatches: 0
Fire Shutters/Louvers: 0
Beam Detectors: 0
Alarm System Type: Campus Tie
Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
Evacuation drill dates: Feb. 5, 2019, March 19, 2019, Sept. 18, 2019, and Oct. 15, 2019
Smoke detection certification: May 14, 2019
NYS Office of Fire Prevention and Control Inspection: Dec. 20, 2019