Skyhall 1
- Address: 410 Lambreth Lane
- Building size: 3 floors plus basement, 3 exits
- Building capacity: 117
Fire Protection Systems
- Sprinkler System: Wet system throughout building including 100% of student rooms
- Fire Pump: 1,000 GPM Electric Flow Meter
- Addressable Pull Stations: 13
- Photo-Electric Smoke Detectors: 36
- Heat Detectors: 12
- Duct Detectors: 0
- Alarm – Bells with Visual: 91
- Fire Extinguishers: 10
- Ansul Systems: 0
- Fire Alarm Control Panel: EST-3
- Sprinkler Supervisory: 9
- Water Flow Switches: 4
- Roof Hatches: 3
- Fire Shutters/Louvers: 0
- Beam Detectors: 0
- Alarm System Type: Campus Tie
- Inspections Requirements: NFPA 72 (1 thru 7)
Inspection, Testing and Maintenance
- Evacuation drill dates: Feb. 6, 2019, March 20, 2019, Sept. 20, 2019, and Oct. 15, 2019
- Smoke detection certification: May 16, 2019
- NYS Office of Fire Prevention and Control Inspection: Sept. 19, 2019